Page 1 of 4

P3 GS750 Project

PostPosted: Sun Feb 08, 2015 10:26 pm
by mccoy
And so it begins..........................I plan to have this ready for june 4th.

Image

Re: P3 GS750 Project

PostPosted: Sun Feb 08, 2015 10:28 pm
by marshall498
June 4th....2015?

Good luck! I have always loved the GS750/1000s

Re: P3 GS750 Project

PostPosted: Sun Feb 08, 2015 10:38 pm
by mccoy
Image
Started tossing the unnecessary stuff.

Re: P3 GS750 Project

PostPosted: Sun Feb 08, 2015 10:40 pm
by mccoy
Image

Re: P3 GS750 Project

PostPosted: Sun Feb 08, 2015 10:44 pm
by mccoy
Image

Re: P3 GS750 Project

PostPosted: Sun Feb 08, 2015 10:45 pm
by mccoy
Image

Re: P3 GS750 Project

PostPosted: Sun Feb 08, 2015 10:49 pm
by mccoy
Cleaned and sandblasted the both rims and mounting hardware. It took about 8 hours.

Image

Re: P3 GS750 Project

PostPosted: Sun Feb 08, 2015 11:02 pm
by mccoy
Bought some new rubber from Walridge Motors. Thanks for the tip, Rick.

Image

Image

Image

Re: P3 GS750 Project

PostPosted: Mon Feb 16, 2015 8:32 pm
by mccoy
Image
More stuff removed.

Re: P3 GS750 Project

PostPosted: Mon Feb 16, 2015 8:37 pm
by mccoy
Image

Steering head bearings.............or most of them. I've removed the inner races and will be installing tapered roller bearings. I'll put a GS850 front end on.

Re: P3 GS750 Project

PostPosted: Sun Mar 15, 2015 10:09 pm
by mccoy
Image
Rear rim painted and tyre mounted.

Re: P3 GS750 Project

PostPosted: Sun Mar 15, 2015 10:12 pm
by mccoy
Image

Re: P3 GS750 Project

PostPosted: Sun Mar 15, 2015 10:14 pm
by mccoy
Image
Removing the engine the easy way.

Re: P3 GS750 Project

PostPosted: Sun Mar 15, 2015 10:16 pm
by mccoy
Image
Ready for compression test, leakdown test and cleaning.

Re: P3 GS750 Project

PostPosted: Fri Apr 03, 2015 9:40 pm
by mccoy
Image
Cut the rear frame.